When cross-flooding arrangements to correct unsymmetrical flooding and excessive heel angels in damaged condition are installed in passenger ships, what is the maximum time allowed for equalization?

17 Jul '19, 14:53

July 17, 2019, 2:53 p.m.
KnowledgeBase's gravatar image




Answer:

The maximum is 15 minutes.