Get help from Pros. Remove ads. Promote your CV or LinkedIn profile.
A systematic procedure for detailed project planning and control. Abbreviated CPM.

Related Terms

ISO STANDARD 4021

The accepted procedure for extracting samples from dynamic fluid lines.

ACQUISITION

The selection of those targets or satellites requiring a racking procedure and the initiation of their tracking.

ALGORITHM

A defined procedure or routine used for solving a specific mathematical problem

RECEIVING POINT

A mark or place at which a vessel comes under obligatory entry, transit, or escort procedure

TAG AND LOCK OUT

A procedure for isolating, notifying a personnel and recording before work can be started on a piece of equipment.

SHIP WEATHER ROUTING

A procedure whereby an optimum route is developed based on the forecasts of weather and seas and the ship’s characteristics for a particular transit. Within specified limits of weather and sea conditions, ship weather routing seeks maximum safety and crew comfort, minimum fuel consumption, minimum time under- way, or any desired combination of these factors.

TIDE TABLES

Tables which give the predicted times and heights of high and low water for every day in the year for a number of reference stations, and tidal differences and ratios by which additional predictions can be obtained for subordinate stations. From these values it is possible to interpolate by a simple procedure the height of the tide at any hour of the day.

JOMINY TEST

A standardized procedure by which the hardenability of a steel is determined.

ADMINISTRATIVE LAW

A part of the law which governs the organization,functions and procedure of administrative agencies of the government to which (quasi)legislative powers are delegated and (quasi) judicial powers are granted,and the extent and manner to which such agencies are subject to control by the courts.

PROCEDURE

Steps to be followed in order to comply with a formality, including the timing, format and transmission method for the submission of required information.
Get help from Pros. Remove ads. Promote your CV or LinkedIn profile.

Related questions

MarineProHelp 2018 - 2022